Ok, I'm a week behind in posting updates here. The following pics were taken this past Mother's Day. I had told my wife about five minutes before we arrived at the site that I doubted Bobby would be there on Mother's Day, but lo and behold, there he was. Here he is standing in the front entrance to his new place.
Here, just inside the front doorway, we are looking to the back end of the building. The straightaway for the King track will be parallel to the wall on the right with the main bank at the far end. The starting line for the drag strip will be at the far left corner of the room and be parallel to the wall on the left. The little room left of center on the back wall will be Bobby's paint room. Bobby has painted many many RC and slot car bodies over the years and is quite good at it.
Now I'm standing at approximately where the starting line for the drag strip will be and shooting up toward the front entrance. The small rooms up toward the front are the bathrooms and Bobby's office. The little room protruding from the right side wall is the HVAC room. The drag strip will obviously be to the left of it. Bobby's retail counter will be between where the mobile lift is now and the front door.
This was my best attempt to get a shot of the plans for the whole place. The front entrance is at the bottom left. Bobby's office and bathrooms are along the left side of the photo. The Gerding tri-oval is out in front of them. The Hasse built drag strip runs along the top of the photo and the Canadian built Ogilvie Blue King will occupy the bottom center and right of the pic. Sheet rock arrived this past week and is going up. The whole place will have a dropped ceiling at 9 1/2 feet above the floor. I have been assured this place will be WELL LIT.
I'll try to get another update for you in the next week or so. In the meantime, have fun building or racing.