I thought I would post here as well. This is my new track. It was designed in Solidworks and has been under construction since the first week or so of May 2013. Working on the relay boards now. I will have a switch to reverse the direction of the track keeping the polarity correct. It uses a bunch of relays so hoping to have those board done early this week. Later this week the drivers station panels will be completed and hooked up. This will put me on schedule to power up and test Thanksgiving weekend.
The track is 106ft long. The banked turn (T1) is at 28deg. T2 is at about 4deg. T3 is uphill at around 5deg (no banking). The doughnut is at 8deg and the lead on turn starts at zero and goes on to the main straight at 2deg.